Energy efficiency for Tetra Pak Italia

Efficiency and advanced logistics: the new photovoltaic system for Tetra Pak Italia

Tetra Pak Italia, a global leader in food processing and packaging solutions, has taken a decisive step toward improving the energy sustainability of its site.

The main challenge of the project was not only technical, but above all logistical and organizational: it was essential to install a large-scale system while minimizing disruption to daily site operations and coordinating in real time with ongoing roof waterproofing renovation works.

Installation type

Rooftop Photovoltaics

Installed capacity

846 kWp

CO2 emissions avoided

580 tons/year

► Technical Features

Performance, Reliability, and Innovation: the figures behind a high-efficiency system.

 

The infrastructure developed by BayWa r.e. Power Solutions features the following characteristics:

 

  • Covered surface area: 4,200 m² of photovoltaic modules installed across two industrial buildings at the plant.

  • Estimated energy production: 980,000 kWh/year of clean, renewable energy.

  • System integration: During the engineering and design phase, the new system was fully integrated and coordinated with the existing photovoltaic installation located on the parking area canopies.

tetra-pak-1-logo-png-transparent
Tetra Pak 1

triangles_bottom_overlay

 

 

 

 

 

 

 

 

 

 

 

 

► Client Benefits

Green energy self-sufficiency.

 

A project that combines environmental sustainability, operational continuity, and energy efficiency, delivering tangible and measurable benefits for the business. 

 

  • Certified Green Impact: A significant reduction in greenhouse gas emissions, avoiding approximately 580 tons of CO2 released into the atmosphere each year.


  • Energy Self-Sufficiency: An annual production close to one million kWh, capable of covering a substantial share of the site’s industrial energy demand.


  • Zero Downtime: Thanks to careful scheduling during public holidays, Tetra Pak Italy implemented a fully turnkey system without any interruption or slowdown in production.


  • Optimization of Existing Assets: Seamless integration and optimized energy performance between the new rooftop system and the existing installation on the parking canopies.

  

Image placeholder

 

triangles_top_overlay

 

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate.” (350)

Vector_balloon_lungo

Cliente/ direttore operativo

Testimonial

Contact us to design, manage, and maintain your photovoltaic system in the best possible way.

Legal and operational headquarters
Via Assunta, 61 – Building D
20834 – Nova Milanese (MB)

Tel. +39 0362 080002
Fax +39 0362 459641

Office Roma
Via Adriano Olivetti 24
00131 – Roma

Tel. +39 06 45551300
Fax +39 06 45776330

Office Bologna
Via dei Lapidari, 13
40129 – Bologna (BO)

Tel. +39 051 6651890
Fax +39 051 6655091

Office Genova
Via Rolla, 26
16152 – Genova (GE)

Tel. +39 010 8599425

Office Verona
Via A. Righi, 2
37135 – Verona (VR)

Tel. +39 045 4753907

Office Firenze (General Contracting)
Via Renato Bruschi, 128
50019 – Sesto Fiorentino (FI)

Eco2Air Operating Site
Via Anna Frank, 2 
22076 – Mozzate (CO)

Office Middle East
3852 Khaleej Rd, Ash Shati Ash Sharqi
31421 – Dammam

Kingdom of Saudi Arabia