Tailor-made sustainability for F.I.P.
Tailor-made sustainability: the photovoltaic system of F.I.P. (Aliaxis Group) in Genoa
BayWa r.e. Power Solutions designed and installed a tailor-made photovoltaic system specifically developed for the needs of the Ligurian plant. Injection molding industrial processes are well known for being highly energy-intensive.
The company required a structured solution to reduce electricity costs while also achieving the Group’s ambitious sustainability targets (a 75% reduction in CO2 emissions by 2025).
The distinctive feature of the project lies in the optimization of both space and installation time: an integrated electrical substation was built inside a shipping container, housing all components and a dedicated inverter area. The system was delivered ready to use, minimizing disruption to production during the construction phase.
Installation type
Rooftop Photovoltaics
Installed capacity
1.11 MWp
CO2 emissions avoided
639 tons/year
|
Technical Feature |
Detail |
|
Total plant capacity |
1.11 MWp (megawatt peak) |
|
Estimated annual production |
1,204 MWh (megawatt-hours) |
|
Number of installed modules |
Over 2,000 photovoltaic panels |
|
Occupied surface area (roof coverage) |
5,272 m² on the plant rooftop |
|
Connection technology |
Pre-wired plug & play electrical substation housed in a dedicated container |
|
Inverters |
4 centralized, protected inverters |

Benefits of Solar Energy for the Industrial Site.
The installation of the photovoltaic system represents a strategic step toward greater energy efficiency, sustainability, and optimization of operational costs.
-
High self-consumption: 85% of the clean energy produced annually by the system is directly consumed by the plant, maximizing the return on investment and overall system efficiency.
-
Environmental sustainability: A significant reduction of the ecological footprint, with an estimated saving of 639 tons of CO₂ per year, aligning the company with the global targets of the Aliaxis Group.
-
Economic efficiency: A substantial reduction in fixed electricity supply costs for a production site employing over 250 internal staff members.
-
Turnkey (Plug & Play) solution: Thanks to the pre-assembled electrical substation, installation and commissioning times were reduced to a minimum, eliminating production downtime risks.
“Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate.” (350)
Cliente/ direttore operativo
Testimonial
Contact us to design, manage, and maintain your photovoltaic system in the best possible way.
Legal and operational headquarters
Via Assunta, 61 – Building D
20834 – Nova Milanese (MB)
Tel. +39 0362 080002
Fax +39 0362 459641
Office Roma
Via Adriano Olivetti 24
00131 – Roma
Tel. +39 06 45551300
Fax +39 06 45776330
Office Bologna
Via dei Lapidari, 13
40129 – Bologna (BO)
Tel. +39 051 6651890
Fax +39 051 6655091
Office Genova
Via Rolla, 26
16152 – Genova (GE)
Tel. +39 010 8599425
Office Verona
Via A. Righi, 2
37135 – Verona (VR)
Tel. +39 045 4753907
Office Firenze (General Contracting)
Via Renato Bruschi, 128
50019 – Sesto Fiorentino (FI)
Eco2Air Operating Site
Via Anna Frank, 2
22076 – Mozzate (CO)
Office Middle East
3852 Khaleej Rd, Ash Shati Ash Sharqi
31421 – Dammam
Kingdom of Saudi Arabia